image5

Site Reconnaissance, Subsurface Exploration, and Analysis

Sinkhole Remediation Recommendations

On-site AASHTO Accredited Laboratory

Geotechnical Engineering Team

Our Work- Geotechnical Engineering

The Shoppes at Redstone Square

image8

Morell Engineering provided geotechnical engineering, site work and building construction layout and control, and CMT services for the 45,600 square-foot Publix grocery store and 14,000 square-foot retail shop. Morell Engineering also surveyed and prepared the as-building drawings for this project. 

Athens High School

image9

Athens High School consists of a 285,000 square-foot building that is situated on a 46-acre property located west of US Highway 31 in Athens, AL. Morell Engineering previously provided geotechnical services for this project, and we are currently providing construction materials testing (CMT) and surveying services for this project.

Asahi Kasei Plastics

image10

This facility included a 123,000 square-foot building, a new rail yard, a material and container storage area, loading docks, and parking and drive areas. Morell Engineering provided geotechnical, surveying, and CMT services for this project. 

Shape Corporation

image11

Shape Corporation constructed a new manufacturing facility on a 35-acre property located north of Roy Long Road in Athens, Alabama. This facility included a 110,000 square-foot building, loading docks, and parking and drive areas. Morell Engineering provided geotechnical, surveying, and CMT services for this project. 

Huntsville International Airport Group VI Phase 4B

image12

Performed geotechnical engineering, provided Resident Project Representative, construction materials testing, and quality assurance surveying.

JMJ Development Apartments

image13

Morell Engineering provided geotechnical engineering services for JMJ Developments as the planned to build a new apartment complex. Services included drilling soil boring and performing test pit excavations. Lab tests were performed in order to prepare recommendations for site grading, and foundation and pavement deigns were also completed.